How Much Paver Base Do I Need?
A 10 × 10 ft patio with a 4 inch compacted base takes about 2.28 tons of dense-graded base; with 10% extra, 2.51 tons. Delivered loose, that is about 1.67 cubic yards, or 91 bags of 0.5 cubic feet.
Base for common jobs, with 10% extra:
| Project | Size | Tons | Bags |
|---|---|---|---|
| Walkway | 3 × 20 ft, 4 in | 1.51 | 55 |
| Patio | 12 × 12 ft, 4 in | 3.62 | 131 |
| Patio | 16 × 20 ft, 4 in | 8.04 | 290 |
| Paver driveway | 12 × 40 ft, 6 in | 18.09 | 652 |
| Project | Size | Compacted depth | Tons | Loose cu yd | Bags |
|---|---|---|---|---|---|
| Walkway | 3 × 20 ft | 4 in | 1.51 | 1.00 | 55 |
| Patio | 12 × 12 ft | 4 in | 3.62 | 2.41 | 131 |
| Patio | 16 × 20 ft | 4 in | 8.04 | 5.36 | 290 |
| Paver driveway | 12 × 40 ft | 6 in | 18.09 | 12.06 | 652 |
Enter the depth you want after compaction; the calculator works out how much loose material that takes. Bags and cubic yards are counted loose, the way the stone is sold, and tons stay the same whether the stone is loose or packed.
How Deep Should Paver Base Be?
The Concrete Masonry & Hardscapes Association (CMHA), formerly ICPI, sets these minimums for well-drained soil:
| Use | Compacted base | Bedding sand on top | Dig below finished grade |
|---|---|---|---|
| Patio or walkway | 4 in min | 1 in | 7-3/8 in |
| Residential driveway | 6 in min | 1 in | 9-3/8 in |
| Street | 8–10 in | 1 in | 12-1/8 in and more |
The digging depth adds the base, the 1 in sand bed and the paver: 2-3/8 in thick for patios and driveways, 3-1/8 in for streets. Clay, wet or frost-prone soils need a thicker base, and the CMHA lists a geotextile under the base as an option there. The pavers sit on 1 inch of concrete sand screeded loose over the compacted base, never on stone dust or screenings.
Run the Base Past the Edges
The base has to be wider than the pavers. The CMHA's rule of thumb is that it runs past the spikes of the edge restraint by at least its own thickness, so a 4 inch base reaches at least 4 inches beyond the patio on every side. Add twice the depth to the length and the width before you enter them:
That is about 14% more than the patio alone, and the extra is what keeps the edge restraint's spikes in solid stone. When you count the pavers and base together, that calculator adds this margin on its own.
How Much Does Paver Base Compact?
Dense-graded base, crushed stone with its fines, shrinks a lot when you compact it. Penn State's road program lays it 6 inches loose to finish at 4 1/2:
- 1Spread loose: 6 in
- 2After the plate compactor: 4 1/2 in, the same tons of stone
The Federal Highway Administration's gravel road guide puts the loss at 30% or more of the loose volume, and the Army's earthmoving manual says a compacted volume takes about 1.17 times as much loose material. The calculator weighs the base at about 1.85 tons per compacted cubic yard, then converts the tons back to loose cubic yards and bags at about 1.5 tons per loose yard. Open-graded #57 stone hardly compacts, so its yards and bags match the finished volume.
- 1Dig out the area deep enough for the base, the bedding sand and the pavers, and compact the soil at the bottom.
- 2Spread the base in lifts of about 4 to 6 inches, as the CMHA recommends, and compact each one with a plate compactor before the next.
- 3Check the finished base with a 10 ft straightedge: the CMHA allows 3/8 inch of variation. Fix low spots in the base, not with extra sand.
- 4Screed 1 inch of concrete sand over the finished base and lay the pavers. Work out the bedding sand for the same area.
How to Calculate Paver Base
Work out the compacted volume, weigh it at the in-place density, then convert to what you buy:
Paver Base vs. Gravel, Crusher Run and Road Base
- Paver base, crusher run, road base, ABC: names for the same kind of material, dense-graded crushed stone in a range of sizes down to dust. The fines fill the gaps and let it compact hard. Bagged paver base is this material in 0.5 cu ft bags; for big jobs, work out the road base by the ton.
- #57 crushed stone: open-graded, clean stone about 3/4 to 1 inch with no fines. It drains freely and is used under permeable paver systems, with a finer bedding layer above it. The crushed stone calculator covers it.
- Pea gravel and river rock: round stones that roll instead of locking together. They don't compact and don't belong under pavers.
- Stone dust or screenings: fine enough to screed but they hold water and don't compact evenly; the CMHA rules them out as bedding.
A retaining wall sits on its own base of clean wall rock, not dense-graded paver base; count it with the wall blocks.
Bags or Bulk Paver Base?
Cost of a 4 inch base with 10% extra, delivered in bulk at $40 a ton plus $100, against 0.5 cu ft bags at $5:
- Bags: about $5 for 0.5 cubic feet, about 56 lb each. Fine for a small walkway; a 12 × 12 ft patio already takes 131 bags, almost 4 tons to lift twice.
- Bulk: dense-graded base runs around $40 per ton plus delivery. Bulk wins as soon as the delivery fee is spread over a ton or two: for the 10 × 10 ft patio, $200 delivered against $455 in bags.
Have the truck dump it as close to the patio as it can, on a tarp if it lands on the lawn, and order the bedding sand with the same delivery.
Frequently Asked Questions
How much paver base do I need for a 12 × 12 patio?
For a 4 inch compacted base, about 3.29 tons of dense-graded base; with 10% extra, 3.62 tons. That is about 2.41 cubic yards as delivered, or 131 bags of 0.5 cubic feet. Run the base 4 in past the edges and it grows by about a tenth.
How deep should paver base be?
At least 4 inches compacted under patios and walkways and at least 6 inches under driveways, according to the Concrete Masonry & Hardscapes Association. Use more on clay, wet or frost-prone soils.
How deep do I dig for pavers?
The base, plus 1 inch of bedding sand, plus the paver: 4 + 1 + 2-3/8 = 7-3/8 inches below the finished surface for a patio, and 9-3/8 inches for a driveway on a 6 inch base. Dig a little wider than the patio so the base can run past the edges.
How many bags of paver base do I need per square foot?
About 0.83 bags of 0.5 cubic feet per square foot for a 4 inch compacted base, or 83 bags per 100 square feet before extra. The loose material in a bag packs down when you compact it.
How much does a ton of paver base cover?
About 44 square feet at 4 inches compacted and 29 square feet at 6 inches, for dense-graded base at about 1.85 tons per compacted cubic yard.
How much does paver base compact?
A lot. The Federal Highway Administration notes that compacting dense-graded aggregate can cut its volume by 30% or more, and Penn State places 6 inches loose to finish at 4 1/2. That is why the calculator counts tons by the compacted depth and bags and yards loose.
What is the difference between paver base and paver sand?
Paver base is the crushed stone layer, 4 inches or more, compacted in lifts. Paver sand is the 1 inch layer of concrete sand screeded loose on top, which the pavers are set into.
Can I use gravel or stone dust as paver base?
Use dense-graded crushed stone (crusher run, road base) or an open-graded base such as #57 stone. Pea gravel is round, so it rolls instead of locking together, and stone dust is never used as the bedding layer under pavers.
What is the best paver base for clay soil?
A thicker layer of the same dense-graded base, over a geotextile. The CMHA lists geotextile under the base as an option on clay and moist silty soils and where the ground freezes, and calls for thicker bases on wet or weak soil.
How much does paver base cost?
About $5 for a 0.5 cubic foot bag and around $40 per ton in bulk plus delivery. For a 10 × 10 ft patio that is about $200 delivered in bulk against $455 in bags.
Sources
- Concrete Masonry & Hardscapes Association. (2022a). Construction of interlocking concrete pavements (PAV-TEC-002-22).
- Concrete Masonry & Hardscapes Association. (2022b). Edge restraints for interlocking concrete pavements (PAV-TEC-003-22).
- Headquarters, Department of the Army. (2000). Earthmoving operations (FM 5-434).
- Penn State Center for Dirt and Gravel Road Studies. (2025). Driving surface aggregate [Technical bulletin].
- Skorseth, K., Reid, R., & Heiberger, K. (2015). Gravel roads construction and maintenance guide (FHWA-OTS-15-0002). Federal Highway Administration.
- U.S. Department of Agriculture, Natural Resources Conservation Service. (2017). Earth and aggregate surfacing design guide (Technical Note 210-AEN-04).
- Wisconsin Department of Transportation. (2024). 2025 standard specifications (Section 305, Dense-graded base).