How Much Does a Concrete Slab Cost?
A 20 × 20 ft slab 4 inches thick takes 4.94 cubic yards, 5.43 with 10% extra, so you order 5.5 yards. At $165 a yard that is about $908, or $2.27 per square foot for the concrete. A pump truck, if the mixer can't reach the forms, adds about $1,425.
Concrete for common slabs at $165 a yard delivered, with 10% extra and a $100 short-load fee below 4 yards:
| Slab | Order | Ready-mix | Per sq ft |
|---|---|---|---|
| Patio, 10 × 10 ft, 4 in | 1.5 cu yd | $348 | $3.48 |
| Patio, 12 × 12 ft, 4 in | 2 cu yd | $430 | $2.99 |
| Shed pad, 12 × 16 ft, 4 in | 2.75 cu yd | $554 | $2.88 |
| Slab, 20 × 20 ft, 4 in | 5.5 cu yd | $908 | $2.27 |
| Garage floor, 24 × 24 ft, 4 in | 8 cu yd | $1,320 | $2.29 |
| Driveway, 12 × 40 ft, 5 in | 8.25 cu yd | $1,361 | $2.84 |
Small slabs cost more per square foot because the short-load fee is spread over less concrete: $3.48 for a 10 × 10 ft patio against $2.27 for the 20 × 20 ft slab. Thicker slabs cost more in direct proportion; the driveway at 5 inches pays for a quarter more concrete per square foot than a 4 inch slab.
Ready-mix against 80 lb bags at $6.50, for 4 in slabs:
Bags win only on small pads: a 6 × 6 ft pad costs $143 in bags against $183 by truck with the short-load fee. At 8 × 8 ft the two are about even, and from 10 × 10 ft up the truck is cheaper every time: $908 against $1,593 for the default slab.
How to Calculate the Cost of Concrete
Find the volume in cubic yards, add extra for waste, round up to the next quarter yard and multiply by the price per yard. Add the short-load fee on small orders and the pump if you need one:
What one cubic yard of ready-mix buys:
Ordering 4 to 10% over the plan covers spillage, uneven ground and forms that bow; the ready-mix industry's own guidance is in that range, and the calculator adds 10% by default. Running short mid-pour costs far more than a little left over: a second small truck carries its own short-load fee.
The same 20 × 20 ft slab at three thicknesses:
| Thickness | Order | Ready-mix | Per sq ft |
|---|---|---|---|
| 4 in | 5.5 cu yd | $908 | $2.27 |
| 5 in | 7 cu yd | $1,155 | $2.89 |
| 6 in | 8.25 cu yd | $1,361 | $3.40 |
To find the volume for steps, footings or piers, work out the cubic yards first, then price them here.
Ready-Mix Cost by Order Size
Delivered 3,000 psi concrete at $165 a yard, with the $100 short-load fee below 4 yards:
| Order | Concrete | Short load | Total, per yd |
|---|---|---|---|
| 1 cu yd | $165 | $100 | $265, $265 |
| 2 cu yd | $330 | $100 | $430, $215 |
| 3 cu yd | $495 | $100 | $595, $198 |
| 4 cu yd | $660 | — | $660, $165 |
| 5.5 cu yd | $908 | — | $908, $165 |
| 8 cu yd | $1,320 | — | $1,320, $165 |
| 10 cu yd | $1,650 | — | $1,650, $165 |
Below 4 yards, the fee pushes the real price per yard up fast: one yard costs $265, 60% more per yard than a 10 yard order. Stronger mixes cost more, $3 to $5 a yard for each extra 500 psi, and add-ons such as fiber, hot water in winter or a high-early mix are priced per yard on top.
Short Loads and Minimum Orders
Small loads cost extra per yard: about $150 for deliveries of 1/2 to 3 yards, or a sliding fee from $240–250 for 1 yard down to nothing at 7 yards, which brings one yard to $432 to $437 with fees. Some suppliers set a 3 to 4 yard minimum. The calculator adds a $100 short-load fee below 4 yards.
To dodge the fee, pour two small jobs from one truck, such as a pad and a walk, or bring the order up to the supplier's full-load size. For a yard or less, bags often cost less than a short load.
Pump Truck Cost
A pump is needed when the mixer can't back up to the pour: a backyard patio behind the house, a basement slab, or forms far from the street. Boom pumps run about $475 to $495 an hour with a 3-hour minimum, or $414 to $473 an hour with a 4-hour minimum, so a short job runs about $1,400 to $1,900 for the pump alone. The calculator starts with 3 hours at $475.
On the default slab, the pump costs more than the concrete: $1,425 against $908. Before you book one, check whether the truck's chute can reach. A loaded ready-mix truck weighs about 80,000 lb and may not get across loose dirt, curbs or garden paths, so plan the path it will drive over.
Bags or a Truck?
| Ordering | One cubic yard | Default 20 × 20 slab |
|---|---|---|
| Ready-mix truck | $165 + short-load fee | $908 |
| 80 lb bags at $6.50 | 45 bags, $293 | 245 bags, $1,593 |
An 80 lb bag yields about 0.6 cubic feet, so a yard takes 45 bags and 3,600 lb of lifting. Per cubic foot, ready-mix at $165 a yard is $6.11 and bagged concrete is $10.83. Past a yard, a truck is cheaper and faster, and the whole slab gets poured in one go.
Small jobs in 80 lb bags at $6.50, with 10% extra, against the smallest truck order:
| Job | 80 lb bags | In bags | By truck |
|---|---|---|---|
| AC pad, 3 × 4 ft, 4 in | 8 | $52 | $141 |
| Landing, 4 × 4 ft, 4 in | 10 | $65 | $141 |
| Pad, 6 × 6 ft, 4 in | 22 | $143 | $183 |
| 3 steps, 4 ft wide | 24 | $156 | $224 |
For fence and deck posts, count the bags per post hole.
Labor and Time
The calculator prices the concrete, not the crew. Time is what drives labor: an experienced hand-finishing crew finishes about 1,000 to 2,000 sq ft of slab a day, and a walk-behind power trowel 1,000 to 3,000 sq ft. The default 400 sq ft slab is a few hours of finishing for one crew.
Doing it in bags moves the labor to you. By hand, one worker turns out roughly a yard an hour, so the default slab's 245 bags mean more than five hours of mixing before any finishing, and nearly 10 tons of bags to load and carry. The Army's concrete manual calls hand mixing uneconomical for anything over about a cubic yard.
What Else a Slab Costs
The concrete is only part of the bill. Materials for the default 20 × 20 ft slab, at the other calculators' default prices:
| Item | Amount | Cost |
|---|---|---|
| Ready-mix concrete | 5.5 cu yd | $908 |
| Gravel base, 4 in | 7.6 tons | $480 |
| #4 rebar at 18 in each way | 28 bars of 20 ft | $355 |
| Materials | $4.36 per sq ft | $1,743 |
Forms, a vapor retarder under interior floors, the pump, tools and the finishing crew come on top. Size the gravel base under the slab and lay out the rebar grid. If an old slab has to come out first, price the demolition and haul-off.
Thickness and Strength
The IRC sets a 3 1/2 in minimum for slabs on ground, and the ACI 332 residential standard keeps the same minimum for driveways. Four inches is the common practice, and every extra inch adds a quarter more concrete. Minimum strength by use, from IRC Table R402.2, by how severe the weather is:
| Concrete | Negligible | Moderate | Severe |
|---|---|---|---|
| Foundations and footings not exposed to weather | 2,500 psi | 2,500 psi | 2,500 psi |
| Basement and interior slabs, not garages | 2,500 psi | 2,500 psi | 2,500 psi |
| Exterior walls exposed to weather | 2,500 psi | 3,000 psi | 3,000 psi |
| Porches, carports, outdoor steps, garage floors | 2,500 psi | 3,000 psi | 3,500 psi |
Concrete exposed to moderate or severe weathering must also be air-entrained. ACI 332 goes further for driveways that see freeze-thaw and deicers: 4,500 psi at 28 days. Ask for the mix by strength and use when you order; it changes the price per yard. For a driveway, compare the price with the asphalt driveway cost calculator.
How to Order Ready-Mix
- 1Work out the cubic yards and add 4 to 10% for contingencies. The calculator adds 10% and rounds the order to the next quarter yard.
- 2Ask for the strength your job needs (see the table above). The ready-mix industry calls 3,500 to 5,000 psi typical for most concrete.
- 3Give the stone size and slump: 3/4 or 1 in stone and a 3 to 5 in slump suit most work; pumped concrete and walls may need 7 to 9 in.
- 4Ask for air-entrained concrete if it will freeze in service.
- 5Tell the plant the address, how the concrete gets to the forms (chute, pump or buggies) and when, and book well ahead.
- 6Have the crew and tools ready when the truck arrives: concrete sets within two to eight hours of mixing. Measure well, so you don't need a small clean-up load at the end.
How to Keep the Cost Down
- Measure the depth in several spots. On a 4 in slab, 1/8 in of extra depth leaves the order about 3% short, and a second truck brings a second short-load fee.
- Order at least 4 yards when you can. Combine the patio with a walk or a pad and the fee disappears.
- Use the chute. Clear a path for the truck so you don't need a pump.
- Be ready when the truck arrives. Suppliers allow a set unloading time and charge for waiting past it.
- Use bags for the small stuff. Posts, a pad under a heat pump or a single step cost less in bags than a short load.
Frequently Asked Questions
How much does a yard of concrete cost?
Delivered ready-mix runs from about $125 to $195 a cubic yard, and the calculator starts at $165. Orders under 4 yards add a short-load fee, $100 by default, so a single yard comes to $265.
How much does a 20 × 20 concrete slab cost?
A 20 × 20 ft slab 4 inches thick takes 5.5 cubic yards with 10% extra, about $908 in ready-mix at $165 a yard, or $2.27 per square foot for the concrete alone. A pump adds about $1,425; the gravel base and rebar add about $835 more in materials.
How much does a 10 × 10 concrete slab cost?
About $348 for the concrete in a 4 in slab: 1.5 cubic yards at $165 plus a $100 short-load fee. In 80 lb bags it takes 62 bags, about $403.
How much does concrete cost per square foot?
For the concrete alone in a 4 in slab, about $2.25 to $3.50 per square foot at $165 a yard: one cubic yard covers 81 square feet at 4 inches, and small slabs pay a short-load fee on top. Each extra inch adds about a quarter more concrete.
How much does a concrete driveway cost?
A 12 × 40 ft driveway 5 inches thick takes 8.25 cubic yards with extra, about $1,361 in ready-mix, or $2.84 per square foot for the concrete. Base, forms, steel and finishing are extra.
What is a short-load fee?
A charge for a truck that carries less than a full load: about $150 for deliveries of 1/2 to 3 cubic yards and nothing from 4 yards up, or a sliding fee from $240 to $250 for a 1 yard load down to nothing at 7 yards.
How much does a concrete pump cost?
About $475 to $495 an hour with a 3-hour minimum, $1,425 to $1,485 a visit, or $414 to $473 an hour with a 4-hour minimum.
Are bags cheaper than a ready-mix truck?
Only for small jobs; past a yard or so the truck wins. A cubic yard takes 45 bags of 80 lb mix; at $6.50 a bag that is $293, against about $165 a yard from a truck plus any short-load fee. Bags win on pads up to about 8 × 8 ft.
How much more does a 6 inch slab cost than a 4 inch slab?
About half again as much concrete. A 20 × 20 ft slab takes 5.5 cubic yards at 4 inches ($908) and 8.25 at 6 inches ($1,361).
How much concrete does a truck carry?
Most ready-mix trucks carry 8 to 12 cubic yards. Ready-mix is ordered in quarter-yard steps, so a 5.43 yard job is ordered as 5.5 yards.
Sources
- American Concrete Institute. (2012). Concrete craftsman series: Slabs-on-ground (CCS-1, 3rd ed.).
- Headquarters, Department of the Army. (1998). Concrete and masonry (FM 5-428).
- International Code Council. (2020). 2021 International Residential Code (Sections R402.2, R506.1).
- National Ready Mixed Concrete Association. (2016). CIP 8: Discrepancies in yield.
- National Ready Mixed Concrete Association. (2023). CIP 31: Ordering ready mixed concrete.
- Pennsylvania Department of Transportation, LTAP. (2010). Estimating concrete amounts (Technical Information Sheet 143).
- Tennessee Concrete Association. (n.d.). Concrete driveways in Tennessee [ACI 332-20 summary].
Updated .
Cite this page as:
Daniel, P. Concrete Cost Calculator. Available at: https://constructioncalculators.com/concrete-cost-calculator/. Accessed: October 28, 2026.