ConstructionCalculators

Post Hole Concrete Calculator

Enter the post, the hole and how many posts to get the bags of concrete to buy, with the gravel base and the cost.

12"24"6"
Holes
in
in
in

You need

38bags

50 lb fast-setting, for 10 posts

Per post24" of concrete; 4 if you open a bag for each hole
3.74
concrete in all; 0.375 cu ft a bag
14.01 cu ft
Concrete cost
$303
Gravel base
$48

How Many Bags of Concrete per Post?

A 4×4 post in a 12 in hole 30 in deep, with 6 in of gravel at the bottom, takes 3.74 bags of 50 lb fast-setting concrete. Ten posts take 38 bags if you share leftover mix between holes, or 40 if you open fresh bags for each.

Bags of 50 lb fast-setting concrete per post, by the depth of concrete (not counting the gravel):

Post and hole18 in24 in36 in
4×4 in a 10 in hole1.842.463.68
4×4 in a 12 in hole2.803.745.60
6×6 in a 16 in hole4.746.339.49
6×6 in an 18 in hole6.238.3012.46

Round up for each hole if you mix bag by bag: a 4×4 in a 12 in hole with 24 in of concrete is 4 bags, not 3.74. With fast-setting mix poured dry, you can split the last bag between two holes.

Bags per post with 24 in of concrete, fast-setting against regular 80 lb mix:

50 lb fast-setting80 lb concrete mix
4×4 · 10 in
2.46
1.53
4×4 · 12 in
3.74
2.33
6×6 · 16 in
6.33
3.95
6×6 · 18 in
8.30
5.19
50 lb fast-setting, 80 lb concrete mix, in bags per post

The hole size matters more than the post. Going from a 10 in to a 12 in hole for the same 4×4 adds about half again as much concrete, and a 6×6 in the 18 in hole the 3× rule calls for takes more than twice what the 4×4 does in a 12 in hole.

How to Calculate Concrete for a Post Hole

Take the area of the hole, subtract the post, multiply by the depth of concrete and divide by what one bag makes:

Bags = (π × hole² ÷ 4 − post area) × concrete depth ÷ 1,728 ÷ bag yieldHole: π × 12² ÷ 4 = 113.1 sq in; 4×4 post: 3.5 × 3.5 = 12.25 sq in(113.1 − 12.25) × 24 in of concrete ÷ 1,728 = 1.40 cu ft1.40 ÷ 0.375 cu ft per 50 lb bag = 3.74 bags

The concrete depth is the hole depth less the gravel base: 30 in − 6 in = 24 in. Use the post's actual size, not its name: a 4×4 is 3 1/2 in square and a 6×6 is 5 1/2 in. For a round post, the area is π × diameter² ÷ 4.

A 6×6 post in an 18 in hole, three times its size:

18 in24 in6 in
18 in hole, 24 in of concrete over 6 in of gravel · 8.30 bags of 50 lb fast-setting mix · 3.11 cu ft

Hole Size and Depth

  • Width: three times the post's width (Quikrete, Sakrete): about 12 in for a 4×4 and 16 to 18 in for a 6×6. Chain link posts go in holes four times their size, Master Halco says.
  • Depth: one-third to one-half of the post's height above ground, plus about 6 in of gravel, by Quikrete; its data sheet also gives one-third of the post's overall length, which works out the same as half the height above ground. Master Halco sets chain link posts 36 in deep in firm soil.
  • Frost: posts that support a deck or other structure go at least 6 in below the frost line, Quikrete notes; check your local frost depth.

Hole depth by fence height, by Quikrete's rule of one-third to one-half of the height above ground, plus the gravel:

Fence heightConcrete depthHole with 6 in gravel
4 ft16–24 in22–30 in
6 ft24–36 in30–42 in
8 ft32–48 in38–54 in

The default in the calculator, a 30 in hole with 6 in of gravel, is the shallow end for a 6 ft fence. For the depth from the fence height and your frost line, check the post depth for your fence; to count the posts along a run, use the fence calculator.

How to Set a Post in Concrete

  1. 1Dig the hole three times as wide as the post and 6 in deeper than the depth you want in concrete.
  2. 2Pour about 6 in of gravel or crushed stone into the bottom, then compact and level it.
  3. 3Set the post on the gravel, plumb it and brace it so it stays put.
  4. 4Pour fast-setting mix dry around the post to about 3 to 4 in below the top of the hole.
  5. 5Soak it with about 1 gallon of water per 50 lb bag, as Quikrete directs. With regular concrete mix, mix it in a tub or wheelbarrow first, then shovel it in.

For posts that carry a load, such as a deck or a pergola, use the hole size and depth on the plans.

Which Bag to Use

BagYieldBags for 10 postsCost
50 lb fast-setting0.375 cu ft38$303
60 lb concrete mix0.45 cu ft32$155
80 lb concrete mix0.6 cu ft24$156

Fast-setting mix is poured dry into the hole around the post and soaked with about 1 gallon of water per 50 lb bag, so there is nothing to mix. Regular concrete mix is mixed first and then poured; it yields more per bag and costs less per post. An 80 lb bag yields 0.6 cu ft, so the default job needs 24 of them instead of 38 fast-setting bags.

Bags for a Whole Fence

4×4 posts in 12 in holes 30 in deep with 6 in of gravel, sharing leftover mix between holes:

Fence50 lb fast-setting80 lb mixGravel, 0.5 cu ft bags
5 posts19124
10 posts38248
20 posts754716
30 posts1137124

Sharing only works when you mix or pour one hole right after another. If you mix 80 lb bags one hole at a time, each 4×4 takes 3 bags, so ten posts need 30 instead of 24. If corner, end or gate posts use a bigger post or hole, run them through the calculator separately and add the bags.

Common Mistakes

  • Counting the gravel as concrete. With all 30 in of the hole filled, a 4×4 takes 4.67 bags instead of 3.74, a quarter more.
  • Using the post's name as its size. A 4×4 is 3 1/2 in square. Treating it as a full 4 in post gives 3.60 bags instead of 3.74, a small undercount on every hole.

Deck Posts and Footings

A deck post is a structural support, not a fence post. The IRC sizes deck footings from the deck area on each post and the soil. They sit 12 in or more under undisturbed ground, and a deck fastened to a house with frost-protected footings needs them under the frost line too. Quikrete adds that a structural post hole goes at least 6 in below the frost line. Size the footing, and for round piers in tube forms, figure the concrete per tube.

What Post Concrete Costs

Fast-setting concrete mix costs $7.97 for 50 lb and regular concrete mix $4.85 for 60 lb. The default ten posts come to $303 in fast-setting bags, about $30 a post, plus 8 bags of gravel for the base, about $48. In 60 lb or 80 lb bags of regular mix the concrete costs about half as much.

Frequently Asked Questions

How many bags of concrete do I need per fence post?

About 3 3/4 bags of 50 lb fast-setting concrete for a 4×4 post in a 12 in hole with 24 in of concrete, or about 2 1/2 bags in a 10 in hole. Quikrete's data sheet sets a 3 in post in a 9 in hole 30 in deep with two 50 lb bags, with the bottom of the hole in gravel.

How much concrete for a 4×4 post?

A 4×4 measures 3 1/2 in square. In a 12 in hole with 24 in of concrete it takes about 1.4 cu ft, 3.74 bags of 50 lb fast-setting mix or 2.33 bags of 80 lb mix.

How much concrete for a 6×6 post?

A 6×6 measures 5 1/2 in square. In an 18 in hole, three times its size, with 24 in of concrete it takes about 3.1 cu ft, or 8.3 bags of 50 lb fast-setting mix.

How big should a fence post hole be?

Three times the width of the post, Quikrete and Sakrete say: about 12 in across for a 4×4 post and 18 in for a 6×6. Master Halco's chain link guide calls for holes four times the post's outside size.

How deep should a fence post hole be?

One-third to one-half of the post's height above ground, plus about 6 in of gravel, by Quikrete: 2 to 3 ft for a 6 ft fence. Quikrete's data sheet also gives one-third of the overall post length. Posts that carry a deck or other structure go at least 6 in below the frost line.

Do I need gravel under a fence post?

Quikrete and Sakrete both call for a gravel base, about 4 to 6 in, compacted, under the post for drainage. The calculator leaves that depth out of the concrete and counts the gravel in 0.5 cu ft bags.

Should I use fast-setting or regular concrete for posts?

Either works. Fast-setting mix goes into the hole dry and is soaked with water, so there is nothing to mix; regular concrete mix yields more per bag and costs less, but you mix it first. For the default ten posts it is 38 bags of 50 lb fast-setting or 24 bags of 80 lb mix.

How much water for fast-setting concrete?

About 1 gallon for each 50 lb bag of Quikrete Fast-Setting Concrete Mix, poured over the dry mix in the hole, by its data sheet. Fill the hole to about 3 to 4 in from the top.

How much concrete for a deck post?

A deck post sits on a footing sized by the deck area it carries and goes below the frost line. As an example, a 6×6 post in a 12 in hole with 42 in of concrete takes about 2 cu ft, 3.36 bags of 80 lb mix. Size the footing first; the hole is often larger.

How much does post concrete cost?

A 50 lb bag of fast-setting concrete mix costs $7.97 and a 60 lb bag of regular concrete mix $4.85. Ten 4×4 posts at the default size take 38 fast-setting bags, about $303, plus about $48 of gravel for the base.

Sources

  • International Code Council. (2020). 2021 International Residential Code (Section R507.3).
  • Master Halco. (2017). Chain link fence guide specification (Section 32 31 13).
  • QUIKRETE Companies. (n.d.). Setting posts without mixing.
  • QUIKRETE Companies. (2006). Setting posts [Project sheet].
  • QUIKRETE Companies. (2025). QUIKRETE Fast-Setting Concrete Mix No. 1004 [Data sheet].
  • Sakrete. (2018). Sakrete Fast Setting Concrete Mix [Technical data sheet].

Updated .

Cite this page as:

Daniel, P. Post Hole Concrete Calculator. Available at: https://constructioncalculators.com/post-hole-concrete-calculator/. Accessed: October 28, 2026.