How Many Metal Roof Panels Do I Need?
A gable roof 50 × 30 ft in plan at a 6/12 pitch takes 34 ribbed panels 17 ft long, 17 on each side. Add 10 pieces of eave trim, 7 of rake trim, 5 of ridge cap, 1,445 screws and 2 rolls of synthetic underlayment; the materials come to $3,103.
Panels, screws and materials for common roofs in plan, overhangs included, with 36 in ribbed panels:
| Plan and pitch | Panels | Screws | Materials |
|---|---|---|---|
| 12 × 14 ft, 4/12 | 10 × 7 ft | 175 | $583 |
| 26 × 26 ft, 4/12 | 18 × 14 ft | 630 | $1,487 |
| 30 × 50 ft, 6/12 | 34 × 17 ft | 1,445 | $3,103 |
| 32 × 60 ft, 6/12 | 40 × 18 ft | 1,800 | $3,896 |
| 40 × 50 ft, 8/12 | 34 × 25 ft | 2,125 | $4,410 |
| Roof | Plan and pitch | Panels | Screws | Materials |
|---|---|---|---|---|
| 10 × 12 ft shed | 12 × 14 ft, 4/12 | 10 × 7 ft | 175 | $583 |
| Two-car garage | 26 × 26 ft, 4/12 | 18 × 14 ft | 630 | $1,487 |
| Default house | 30 × 50 ft, 6/12 | 34 × 17 ft | 1,445 | $3,103 |
| Larger house | 32 × 60 ft, 6/12 | 40 × 18 ft | 1,800 | $3,896 |
| Steep house | 40 × 50 ft, 8/12 | 34 × 25 ft | 2,125 | $4,410 |
One side of the default roof, with 36 in panels laid along the 50 ft eave:
Measure the roof in plan with its overhangs. The panel count follows Fabral's ordering guide: each panel covers 36 inches, so divide the length along the eave by 3 ft. The thin lines are the ribs, 9 inches apart on a 5 Rib panel; the panels lap at the edge rib.
How Many Screws Does a Metal Roof Need?
Fabral counts panel screws per foot of panel, and the closer the screw rows, the more you need. Panel screws for the default roof by the spacing of the rows:
That is 2.5, 3.0 and 4.5 screws per foot of panel: #14 × 1 in screws on solid decking, #9 × 1 in Woodfast screws on 2×4 purlins. Trim takes its own screws: Fabral adds 1 a foot of eave, 2 a foot of gable, 3 a foot of valley, 2.67 a foot of ridge and 4 a foot of hip.
How to Calculate Metal Roofing
Count the panels along the eave of each side, cut them to the rafter length, then add the trim, screws and underlayment:
Fabral asks for two measurements per roof section: the length of the ridge and the distance from the center of the ridge to the eave edge, with nothing added for the overhang past the eave. Each trim piece is 10½ ft long and overlaps the next by 6 inches, so it covers 10 ft. If you don't know the pitch, measure the roof pitch first.
Panel Length by Pitch
Panel length in whole feet for a run from ridge to eave, overhang included:
| Pitch | Slope factor | 12 ft run | 16 ft run | 24 ft run |
|---|---|---|---|---|
| 3/12 | 1.031 | 13 | 17 | 25 |
| 4/12 | 1.054 | 13 | 17 | 26 |
| 6/12 | 1.118 | 14 | 18 | 27 |
| 8/12 | 1.202 | 15 | 20 | 29 |
| 10/12 | 1.302 | 16 | 21 | 32 |
| 12/12 | 1.414 | 17 | 23 | 34 |
For roofs with hips or valleys, Fabral adds or subtracts 36 inches × the slope factor per panel along the hip, for example 40¼ inches at 6/12 and 37 15/16 inches at 4/12. Long runs may need two panels end to end; McElroy makes Max-Rib in standard lengths up to 40 ft, so a run of up to 40 ft can take a single panel.
Minimum Pitch for a Metal Roof
The code sets the floor, and each panel maker can ask for more:
| Panel | Minimum pitch |
|---|---|
| Lapped, no sealant (IRC) | 3/12 |
| Lapped with sealant (IRC) | 1/2 in 12 |
| Standing seam (IRC) | 1/4 in 12 |
| Fabral 5 Rib | 2 1/2 in 12 |
| Union Corrugating MasterRib | 3/12 |
| McElroy Max-Rib | 1/12, sealant below 3/12 |
| Western Rib | 1/12 |
| MBCI LokSeam | 3/12 |
| Panel | Minimum pitch | Source |
|---|---|---|
| Lapped panels, no lap sealant | 3/12 | IRC R905.10.2 |
| Lapped panels with lap sealant | 1/2 in 12 | IRC R905.10.2 |
| Standing seam | 1/4 in 12 | IRC R905.10.2 |
| Fabral 5 Rib | 2 1/2 in 12 | Fabral |
| Union Corrugating MasterRib | 3/12 recommended | Union Corrugating |
| McElroy Max-Rib | 1/12, tape sealant in side laps below 3/12 | McElroy |
| Western States Western Rib | 1/12 | Western States |
| MBCI LokSeam standing seam | 3/12 | MBCI |
The calculator flags any pitch under 3/12. Below that, check the data sheet of the exact panel and plan on lap sealant or tape.
Panels, Trim and Underlayment
Panel Types
- Exposed-fastener ribbed panels such as Fabral 5 Rib and Western Rib cover 36 inches and are screwed through the face. Union Corrugating's MasterRib comes in 29 and 26 gauge, with AZ50 Galvalume coating under the paint and AZ55 on bare panels, for solid decks or open framing.
- Standing seam panels hide their fasteners in clips under the seam. MBCI's LokSeam comes 12, 16 or 18 inches wide with a 1 3/4 in rib; at 16 inches, a 50 ft eave takes 38 panels a side instead of 17. The calculator counts 36 in ribbed panels.
Trim
Eave trim along the eaves, gable or rake trim along the rakes and ridge cap along the ridge, plus hip, valley, sidewall and endwall flashing where the roof has them. Fabral's pieces are 10½ ft long and lap 6 inches.
Underlayment and Deck
On a new roof, Fabral covers the whole deck with 30 lb felt or a synthetic underlayment, each course lapped at least 4 inches over the one below and 6 inches at the ends; the calculator counts synthetic rolls for the roof area plus 10%. Over an old roof, the panels go on 2×4 purlins 24 inches on center, or on underlayment laid as on a new deck. Fabral notes that metal needs a fairly smooth, flat base, so check the deck for high and low spots; count new sheathing panels if it has to be replaced.
Common Mistakes
- Overall width instead of coverage. A ribbed panel is wider than the 36 inches it covers, because one rib laps the panel next to it. Western States, for one, lists its Western Rib by its 36 in net coverage. Count panels by coverage.
- Panel length from the plan. The panel runs along the slope: 16.8 ft on the default roof, not the 15 ft you measure across the plan.
- Rounding the count down. 50 ft ÷ 3 ft is 16.7; the 17th panel is cut to fit, but you still buy it.
- Low pitch, no sealant. Lapped panels below 3/12 need lap sealant by code, and some makers ask for 3/12 regardless.
Metal Roofing Prices
Painted ribbed panels cut to length start at $127.49 per 100 square feet in the calculator and galvanized ones at $122.49, which brings the default roof to $3,017. A 10½ ft trim piece starts at $21.88, screws at $0.12 each and a 1,000 sq ft roll of synthetic underlayment at $119. Click any price in the calculator to change it. For an asphalt roof of the same size, list the asphalt roofing materials, and for the installed price with labor and tear-off, use the metal roof cost calculator.
Frequently Asked Questions
How many metal roofing panels do I need?
Divide the length of the roof along the eave by the panel coverage, 3 ft for 36 inch ribbed panels, and round up, for each side. A 50 ft roof takes 17 panels a side, 34 for a gable roof.
How long should metal roof panels be?
The rafter length from ridge to eave, overhang included: half the roof width times the slope factor. On a 30 ft wide roof at 6/12, 15 × 1.118 = 16.8 ft, so 17 ft panels, cut to length or the next stock size.
How many screws per metal roof panel?
Fabral counts 2.5 panel screws per lineal foot of panel with screw rows 24 inches apart, 3.0 at 18 inches and 4.5 at 12 inches. A 17 ft panel at 24 inches takes about 43 screws; trim screws are extra.
How many screws for metal roofing per square foot?
About 0.83 per square foot of panel at a 24 inch row spacing: 2.5 screws per foot of panel length, spread over its 3 ft width. At 18 inch spacing it is 1 screw per square foot, at 12 inch spacing 1.5.
How much trim does a metal roof need?
Eave trim along the eaves, gable or rake trim along the rakes and ridge cap along the ridge. Fabral's trim comes in 10½ ft pieces lapped 6 inches, so count 10 ft a piece: 10, 7 and 5 pieces on the default roof.
What is the minimum pitch for metal roofing?
3/12 for lapped panels without lap sealant and ½/12 with it, by IRC R905.10.2; ¼/12 for standing seam. Panel makers set their own limits: Fabral asks for 2½/12 for its 5 Rib panels, and Union Corrugating recommends 3/12 for MasterRib.
How far should metal roofing overhang the eave?
Fabral sets each 5 Rib panel 1 inch past the eave edge. Its guide measures the panel length from the center of the ridge to the eave edge and adds nothing for that overhang.
What sizes do metal roofing panels come in?
Ribbed panels cover 36 inches in width; standing seam comes 12, 16 or 18 inches wide. Lengths are precut, such as 12 or 16 ft, or cut to order: McElroy makes its Max-Rib panel in standard lengths up to 40 ft.
How do I figure metal roofing for a hip roof?
Count the panels for each plane along its own eave, the same way as on a gable. Along a hip, each panel is 36 inches times the slope factor shorter than the one before it, 40¼ inches at 6/12. Hip trim is counted in 10 ft pieces, like the ridge cap.
How many metal panels for a 10 × 12 shed?
Ten panels 7 ft long for a 10 × 12 ft shed at 4/12 with 12 in overhangs: the roof is 12 × 14 ft in plan, so 14 ft ÷ 3 = 5 panels a side, and 6 ft of run × 1.054 = 6.3 ft, cut at 7 ft.
Sources
- Fabral. (2011). 5 Rib roofing ordering & installation guide.
- International Code Council. (2020). 2021 International Residential Code (Section R905.10.2).
- MBCI. (n.d.). LokSeam [Product page].
- McElroy Metal. (2020). Max-Rib panel product data.
- Union Corrugating Company. (n.d.). MasterRib [Product sheet].
- Western States Metal Roofing. (n.d.). Western Rib installation, flashings & shop drawing detail guide.
Updated .
Cite this page as:
Daniel, P. Metal Roof Calculator. Available at: https://constructioncalculators.com/metal-roof-calculator/. Accessed: October 28, 2026.