How a Construction Loan Works
A construction loan pays the builder in stages and charges interest only on the money drawn so far. On a $404,000 build with a $91,000 lot and 20% down, the loan is $396,000; drawn evenly over 12 months at 7.5%, the interest-only payment grows from $206 to $2,475, and the build costs about $16,088 in interest.
- Draws: the money goes to the builder in a series of advances as construction progresses, after inspections and your approval of each draw.
- Interest only: during the build you pay interest on the amount drawn, not on the whole loan.
- Conversion: a construction-to-permanent loan turns into a regular mortgage when the house is done. With one closing, the permanent terms are set at the start; with two, the mortgage is a separate loan, possibly from another lender.
- Build time: Fannie Mae allows no single construction period over 12 months and 18 months in all on a one-close loan.
The balance grows with each draw, and the interest-only payment with it:
How to Calculate Construction Loan Payments
Lenders estimate build interest the way Regulation Z tells them to: half of the loan outstanding for the whole build. For the default loan that is $396,000 ÷ 2 × 7.5% = $14,850. The calculator works month by month with draws at the start of each month, which is closer to what you will pay when the lot is paid at closing or the early draws are large.
After the build, the full $396,000 at 7.5% over 30 years costs $2,768.89 a month in principal and interest:
Each half point of rate moves that payment by about $130 a month. Principal and interest on $396,000 over 30 years:
Down Payment
| Loan | Down payment |
|---|---|
| Conventional | 5% to 20%; often 10% fixed, 20% adjustable |
| FHA construction-to-permanent | 3.5% with a 580+ credit score; land equity counts |
| VA | None if the price is not over the appraised value |
| USDA | Loan up to market value plus the guarantee fee |
| Freddie Mac Home Possible | 3%, can be combined with construction-to-permanent |
If you already own the lot, its value works toward the down payment: Fannie Mae measures the loan against the as-completed value of the lot and house, and FHA counts land equity toward its minimum investment. With the default $91,000 lot owned, 20% down needs only $8,000 more in cash. Closing costs of 2% to 5% of the price come on top.
Using Your Land as the Down Payment
When the lot is already yours, its value counts toward the down payment, so the cash you bring shrinks as the lot's value grows. On the $404,000 build, the loan and the cash still needed at 20% and at 10% down:
| Lot owned | Loan at 20% down | Cash at 20% | Cash at 10% |
|---|---|---|---|
| $40,000 | $355,200 | $48,800 | $4,400 |
| $60,000 | $371,200 | $32,800 | $0 |
| $91,000 | $396,000 | $8,000 | $0 |
| $120,000 | $404,000 | $0 | $0 |
A lot worth more than the down payment covers it entirely; the lender still lends no more than its share of the lot and house together. Closing costs are paid in cash either way.
Draw Schedule
Each draw pays for work done and inspected, so the schedule follows the stages of the build. Shares of a new house's construction cost, applied to the $404,000 build:
| Stage | Cost | Drawn |
|---|---|---|
| Site work, permits and fees | $30,704 | 7.6% |
| Foundation | $42,420 | 18.1% |
| Framing | $67,064 | 34.7% |
| Siding, roof, windows and doors | $54,136 | 48.1% |
| Plumbing, electrical and HVAC | $77,568 | 67.3% |
| Interior finishes | $97,364 | 91.4% |
| Driveway, landscaping and cleanup | $26,260 | 97.9% |
| Stage | Share | Cost | Drawn by then |
|---|---|---|---|
| Site work, permits and fees | 7.6% | $30,704 | 7.6% |
| Foundation | 10.5% | $42,420 | 18.1% |
| Framing | 16.6% | $67,064 | 34.7% |
| Siding, roof, windows and doors | 13.4% | $54,136 | 48.1% |
| Plumbing, electrical and HVAC | 19.2% | $77,568 | 67.3% |
| Interior finishes | 24.1% | $97,364 | 91.4% |
| Driveway, landscaping and cleanup | 6.5% | $26,260 | 97.9% |
Site work, the foundation and the framing come to about a third of the cost and are drawn in the first months; finishes come last. The calculator spreads the draws evenly, which is close; a build that draws faster up front pays a little more interest.
Interest by Length of the Build
The longer the build, the longer you pay interest on a growing balance before the mortgage starts. The default loan drawn evenly:
| Build | Last interest-only payment | Interest during the build |
|---|---|---|
| 6 months | $2,475 | $8,663 |
| 9 months | $2,475 | $12,375 |
| 12 months | $2,475 | $16,088 |
| 18 months | $2,475 | $23,513 |
A delay at the end costs the most, because by then nearly the whole loan has been drawn. Fannie Mae allows no single construction period over 12 months on a one-close loan, so a build that runs long may need a modification.
How Much Income You Need
Lenders compare your monthly debts, the new payment included, to your gross monthly income. Fannie Mae's maximum debt-to-income ratio is 36% for a manually underwritten loan and 50% through its automated underwriting. Yearly income for the principal and interest alone at 7.5% over 30 years:
| Loan | Payment | At 36% |
|---|---|---|
| $250,000 | $1,748 | $58,268 |
| $300,000 | $2,098 | $69,921 |
| $396,000 | $2,769 | $92,296 |
| $500,000 | $3,496 | $116,536 |
| Loan | Payment | Income at 36% | Income at 50% |
|---|---|---|---|
| $250,000 | $1,748 | $58,268 | $41,953 |
| $300,000 | $2,098 | $69,921 | $50,343 |
| $396,000 | $2,769 | $92,296 | $66,453 |
| $500,000 | $3,496 | $116,536 | $83,906 |
Property taxes, insurance, car payments and other debts count too, so the income you need is higher than the table shows. During the build you pay only the interest-only draws, but lenders qualify you on the full payment after it.
What Lenders Require
- A licensed builder: for an FHA construction-to-permanent loan, the builder must be a licensed general contractor; you can act as your own only if you hold that license. USDA requires builders with two or more years of experience and at least $500,000 of general liability insurance, and doesn't accept owner-builders.
- An as-completed appraisal: the loan is measured against the value of the lot and the finished house, which the appraiser works out from the plans.
- A budget and draw schedule: the lender pays each draw against the work done and inspected.
- A rate agreement: on an FHA loan the rate may float during construction, within a range agreed in writing, up to a set maximum for the permanent loan.
- An eligible property: Fannie Mae doesn't allow construction-to-permanent loans on attached condo units or co-ops.
Construction Loan vs Mortgage
| Construction loan | Mortgage | |
|---|---|---|
| Money paid out | In draws as the work passes inspection | All at closing |
| Payments | Interest only on what has been drawn | Principal and interest from the start |
| Term | Usually 12 months, up to 18 | Up to 30 years |
| Rate | Often higher; may float during the build | Fixed or adjustable |
| Collateral | A house that doesn’t exist yet | A finished house |
A construction-to-permanent loan is both in one: the first column during the build, the second after. For an addition or a renovation rather than a new house, Fannie Mae's HomeStyle Renovation mortgage lends the work cost with the purchase or a refinance, up to 75% of the as-completed value; smaller projects are usually financed with a home equity loan or a personal loan; you can compare home improvement loans, or finance a detached garage on its own.
Construction Loan Rates
Construction loans usually cost more than ordinary mortgages, the CFPB notes, and the rate may float during the build. Typical rates for comparison:
| Rate | Typical |
|---|---|
| One-close construction, 30-year fixed | 7.375–7.500% |
| Average 30-year mortgage | 7.32% |
| Bank prime rate | 7.00% |
| Federal funds target | 3.75–4.00% |
What It Costs to Build
Custom homes built on the owner's land had a median contract price of $404,000 in 2025, or $171.57 a square foot, not counting the lot, which is where the calculator's default comes from. Construction of a new home averaged $428,215 in 2024, about $162 a square foot, and made up 64.4% of its price. For your own estimate, start with the house construction cost calculator.
Tax on Construction Loan Interest
The IRS lets a home under construction count as a qualified home for up to 24 months, as long as it becomes your home when it is ready, so construction loan interest can go toward the mortgage interest deduction.
Frequently Asked Questions
How do construction loans work?
The lender pays the builder in draws as the work passes inspections, and you pay interest only on what has been drawn. When the house is done, a construction-to-permanent loan converts to a regular mortgage; a construction-only loan has to be paid off or refinanced.
How much down payment do I need for a construction loan?
Lenders advertise conventional construction-to-permanent loans with 5% to 20% down, often 10% for fixed rates and 20% for adjustable ones. FHA allows 3.5% with a credit score of 580 or more, and VA loans need no down payment when the price does not exceed the appraised value.
Can I use my land as the down payment?
Often, yes. FHA lets equity in land you own count toward the 3.5% minimum investment, and Fannie Mae measures the loan against the as-completed value of the lot and house. With a $91,000 lot already owned, the default project needs only $8,000 more in cash for 20% down.
Are construction loan rates higher than mortgage rates?
Usually, the CFPB says. One-close construction loans run about 7.375% to 7.5% for a 30-year fixed rate, against an average 30-year mortgage of about 7.32%.
How long does a construction loan last?
Most build periods run 12 months, sometimes up to 18. Fannie Mae allows no single construction period over 12 months and no more than 18 in total on a one-close loan.
What is a one-time close construction loan?
A single loan that covers the build and then converts to the permanent mortgage, with one closing and one set of closing costs. A two-time close uses one loan for the build and a second closing for the mortgage, possibly with a different lender.
How much is the interest if the build takes longer?
More each month the work runs: the default $396,000 loan drawn evenly costs about $16,088 in interest over a 12-month build and $23,513 over 18 months, because the full balance sits longer.
Can I get a construction loan for an addition or an ADU?
Yes. A renovation mortgage such as Fannie Mae's HomeStyle Renovation lends against the value after the work and can build accessory units and garages where zoning allows; a home equity loan or HELOC is the other common choice for an addition.
Is construction loan interest tax deductible?
It can be. The IRS lets you treat a home under construction as a qualified home for up to 24 months, if it becomes your home when it is ready to live in, so the interest can count toward the mortgage interest deduction.
What will my payment be after construction?
$2,768.89 a month in principal and interest on $396,000 at 7.5% over 30 years, before taxes and insurance.
Sources
- Consumer Financial Protection Bureau. (2019). TILA-RESPA integrated disclosures for construction loans: Guide for separate construction and permanent phase disclosures.
- Consumer Financial Protection Bureau. (2024, September 11). What is a construction loan?
- Fannie Mae. (2025, June 4). B5-3.1-01, Conversion of construction-to-permanent financing: Overview. In Selling guide.
- Fannie Mae. (2025, April 2). B3-6-02, Debt-to-income ratios. In Selling guide.
- Fannie Mae. (2025, December 10). B5-3.2-02, HomeStyle Renovation mortgages: Loan and borrower eligibility. In Selling guide.
- Fannie Mae. (2026, May 6). B5-3.1-02, Conversion of construction-to-permanent financing: Single-closing transactions. In Selling guide.
- Internal Revenue Service. (2026). Publication 936 (2025), Home mortgage interest deduction.
- Multiple advance construction loans, 12 C.F.R. pt. 1026, app. D (2026).
- U.S. Department of Housing and Urban Development. (2026, August 12). Single family housing policy handbook 4000.1.
- U.S. Department of Agriculture. (2026). Single family housing guaranteed loan program, 7 C.F.R. pt. 3555.
- U.S. Department of Veterans Affairs. (2026, January 7). Purchase loan.
Updated .
Cite this page as:
Daniel, P. Construction Loan Calculator. Available at: https://constructioncalculators.com/construction-loan-calculator/. Accessed: October 28, 2026.